For the Zadar Airport project, we are currently carrying out work on the installation of roof and wall systems, using proven and long-lasting solutions adapted for demanding infrastructure facilities.
The roof is constructed using the Kalzip system, which ensures high weather resistance, a long service life, and a modern architectural appearance. At the eaves of the roof, we are installing a combination of polycarbonate panels, metal sheets, and sandwich panels, thereby achieving optimal functionality and aesthetic value.
Work is being done on the walls inside the facility, where we are using polycarbonate panels and sandwich panels. These materials allow for quality insulation, durability, and adaptation to various technical requirements of the space.
This project confirms our expertise in the execution of complex systems and our reliability in working on large infrastructure projects.