{"id":1538,"date":"2021-04-25T08:55:28","date_gmt":"2021-04-25T08:55:28","guid":{"rendered":"https:\/\/www.montaza-izolak.com\/?p=1538"},"modified":"2026-03-28T15:25:31","modified_gmt":"2026-03-28T15:25:31","slug":"brinje-zapocela-izgradnja-kogeneracijskog-postrojenja-na-biomasu","status":"publish","type":"post","link":"https:\/\/montaza-izolak.com\/en\/2021\/04\/25\/brinje-zapocela-izgradnja-kogeneracijskog-postrojenja-na-biomasu\/","title":{"rendered":"Brinje \u2013 Construction of a biomass cogeneration plant has begun"},"content":{"rendered":"<p>The site for the construction of the biomass cogeneration plant is located in Obadine, covering an area of 3.3 hectares. The main contractor is \u0110uro \u0110akovi\u0107 TEP d.o.o. The total value of the entire plant is 18 million kuna, which is also one of the largest investments in the area of the Municipality of Brinje. \u0110\u0110 Monta\u017ea Izolak is performing insulation works for partners from TEP.<\/p>\n<p>It's a plant with a power output of 5MW electrical and 10MW thermal energy. Wood chips will be used as the main raw material.<\/p>\n<p>Insulation work for partners from <strong>TEP-a<\/strong> include<\/p>\n<ul>\n<li>Boiler and equipment insulation in the scope of approx. 1800 m\u00b2<\/li>\n<li>Insulation of pipelines on an area of approx. 2700 m\u00b2<\/li>\n<li>Delivery and installation of boiler lining for 13 tons<\/li>\n<\/ul>\n<p>On this project, we are doing the insulation work for the electrostatic precipitator and for our partners from <strong>MAGMA LLC<\/strong>. Po\u017eega, which includes insulation in the scope of approx. 600 m\u00b2.<\/p>","protected":false},"excerpt":{"rendered":"<p>Lokacija izvo\u0111enja radova izgradnje kogeneracijskog postrojenja na biomasu su Obadine na povr\u0161ini od 3,3 hektara. Glavni izvo\u0111a\u010d radova je \u0110uro \u0110akovi\u0107 TEP d.o.o.. Ukupna vrijednost cjelokupnog postrojenja je 18 milijuna kuna \u0161to je ujedno jedna od najve\u0107ih investicija na podru\u010dju Op\u0107ine Brinje. \u0110\u0110 Monta\u017ea Izolak obavlja izolacijske radove za partnere iz TEP-a. Radi se o [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":1539,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"iawp_total_views":0,"footnotes":""},"categories":[9],"tags":[],"class_list":["post-1538","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-novosti"],"acf":{"photo_gallery":{"galerija":[[]]}},"_links":{"self":[{"href":"https:\/\/montaza-izolak.com\/en\/wp-json\/wp\/v2\/posts\/1538","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/montaza-izolak.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/montaza-izolak.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/montaza-izolak.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/montaza-izolak.com\/en\/wp-json\/wp\/v2\/comments?post=1538"}],"version-history":[{"count":1,"href":"https:\/\/montaza-izolak.com\/en\/wp-json\/wp\/v2\/posts\/1538\/revisions"}],"predecessor-version":[{"id":3819,"href":"https:\/\/montaza-izolak.com\/en\/wp-json\/wp\/v2\/posts\/1538\/revisions\/3819"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/montaza-izolak.com\/en\/wp-json\/wp\/v2\/media\/1539"}],"wp:attachment":[{"href":"https:\/\/montaza-izolak.com\/en\/wp-json\/wp\/v2\/media?parent=1538"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/montaza-izolak.com\/en\/wp-json\/wp\/v2\/categories?post=1538"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/montaza-izolak.com\/en\/wp-json\/wp\/v2\/tags?post=1538"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}