{"id":1538,"date":"2021-04-25T08:55:28","date_gmt":"2021-04-25T08:55:28","guid":{"rendered":"https:\/\/www.montaza-izolak.com\/?p=1538"},"modified":"2026-03-28T15:25:31","modified_gmt":"2026-03-28T15:25:31","slug":"brinje-zapocela-izgradnja-kogeneracijskog-postrojenja-na-biomasu","status":"publish","type":"post","link":"https:\/\/montaza-izolak.com\/de\/2021\/04\/25\/brinje-zapocela-izgradnja-kogeneracijskog-postrojenja-na-biomasu\/","title":{"rendered":"Brinje \u2013 Der Bau eines Biomasse-Heizkraftwerks hat begonnen"},"content":{"rendered":"<p>Der Standort f\u00fcr den Bau des Biomasse-Heizkraftwerks ist Obadine, auf einem 3,3 Hektar gro\u00dfen Gel\u00e4nde. Hauptauftragnehmer ist \u0110uro \u0110akovi\u0107 TEP d.o.o. Der Gesamtwert der gesamten Anlage betr\u00e4gt 18 Millionen Kuna, was auch eine der gr\u00f6\u00dften Investitionen in der Gemeinde Brinje darstellt. \u0110\u0110 Monta\u017ea Izolak f\u00fchrt f\u00fcr seine Partner bei TEP Isolierungsarbeiten durch.<\/p>\n<p>Es handelt sich um eine Anlage mit einer Leistung von 5 MW Strom und 10 MW W\u00e4rmeenergie. Als Hauptrohstoff werden Holzhackschnitzel verwendet.<\/p>\n<p>D\u00e4mmarbeiten f\u00fcr Partner aus <strong>Thermisch \u00e4quivalenter Druck<\/strong> einschlie\u00dflich<\/p>\n<ul>\n<li>Isolierung des Kessels und der Anlagen auf einer Fl\u00e4che von ca. 1.800 m\u00b2.<\/li>\n<li>Rohrisolierung auf einer Fl\u00e4che von ca. 2.700 m\u00b2.<\/li>\n<li>Lieferung und Montage von Kesselw\u00e4nden mit einem Gesamtgewicht von 13 Tonnen.<\/li>\n<\/ul>\n<p>Im Rahmen dieses Projekts f\u00fchren wir die Isolierungsarbeiten am Elektrofilter durch und f\u00fcr Partner aus <strong>MAGMA GmbH<\/strong>. Po\u017eega, einschlie\u00dflich einer D\u00e4mmung auf einer Fl\u00e4che von etwa 600 m\u00b2.<\/p>","protected":false},"excerpt":{"rendered":"<p>Lokacija izvo\u0111enja radova izgradnje kogeneracijskog postrojenja na biomasu su Obadine na povr\u0161ini od 3,3 hektara. Glavni izvo\u0111a\u010d radova je \u0110uro \u0110akovi\u0107 TEP d.o.o.. Ukupna vrijednost cjelokupnog postrojenja je 18 milijuna kuna \u0161to je ujedno jedna od najve\u0107ih investicija na podru\u010dju Op\u0107ine Brinje. \u0110\u0110 Monta\u017ea Izolak obavlja izolacijske radove za partnere iz TEP-a. Radi se o [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":1539,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"iawp_total_views":0,"footnotes":""},"categories":[9],"tags":[],"class_list":["post-1538","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-novosti"],"acf":{"photo_gallery":{"galerija":[[]]}},"_links":{"self":[{"href":"https:\/\/montaza-izolak.com\/de\/wp-json\/wp\/v2\/posts\/1538","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/montaza-izolak.com\/de\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/montaza-izolak.com\/de\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/montaza-izolak.com\/de\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/montaza-izolak.com\/de\/wp-json\/wp\/v2\/comments?post=1538"}],"version-history":[{"count":1,"href":"https:\/\/montaza-izolak.com\/de\/wp-json\/wp\/v2\/posts\/1538\/revisions"}],"predecessor-version":[{"id":3819,"href":"https:\/\/montaza-izolak.com\/de\/wp-json\/wp\/v2\/posts\/1538\/revisions\/3819"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/montaza-izolak.com\/de\/wp-json\/wp\/v2\/media\/1539"}],"wp:attachment":[{"href":"https:\/\/montaza-izolak.com\/de\/wp-json\/wp\/v2\/media?parent=1538"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/montaza-izolak.com\/de\/wp-json\/wp\/v2\/categories?post=1538"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/montaza-izolak.com\/de\/wp-json\/wp\/v2\/tags?post=1538"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}